Skip to content
Design your pod in 3D
FocusPod Solo – 1 Person Office Phone BoothSolo1 person FocusPod Solo Plus – Spacious 1 Person Office PodSolo Plus1 person FocusPod Duo – 2 Person Meeting PodDuo2 people FocusPod Team – 2 Person Face-to-Face Meeting PodTeam2 people FocusPod Meet – 4 Person Meeting PodMeetUp to 4 people FocusPod Max – 6 Person Meeting PodMaxUp to 6 people BespokeCustom sizes & layouts
Compare all models Made to order. Made yours.
Plan a quote

A real team. A considered project.

Live chat Book a video walkthrough Send a project enquiry ↗United Kingdom · GBP

FocusPod / United Kingdom

Office pod installation and building access

Plan how your indoor office pod will reach its final position and be assembled there. Check the unloading point, handling route, doors, lifts and building requirements before ordering. Installation availability and scope are confirmed for your address; your project quote sets out which services are included.

01

Walk the route inside

Measure the loading area, doors, corridors, turns and goods lift as well as the final room. Record lift dimensions and load limits, stairs, access bookings and building-management requirements. Photos and a floor plan help us understand the site.

How your pod arrives

See how your pod arrives in sections and is assembled at your workplace.

Watch video11 seconds

How your pod arrives

Captions includedOpen video
02

Make room around the pod

Review floor suitability and loading, door swing, assembly space, ventilation, servicing access and power. Product dimensions describe the pod itself, not every clearance around it. Have your facilities team review the intended position before approval. Every FocusPod has built-in wheels and adjustable levelling feet. Raise the feet to move the pod on its wheels, then lower and adjust them to level the pod in its new position.

03

Choose the right installation arrangement

Request installation with your project, or tell us that you plan to appoint your own contractor. Coverage, scheduling, handling and the precise scope are confirmed for the address. The configurator's installation amount is a planning allowance until that site-specific review is complete.

04

Power and optional cooling

The supplied pod uses UK-specification plugs and power outlets. The final electrical schedule covers the pod and selected equipment. Optional cooling adds 350 mm to the base height and changes the electrical requirements. Building electrical work needs an appropriately qualified professional.

05

Access and receiving arrangements

Include the full postcode, receiving hours and any loading restrictions. Northern Ireland, islands and other routes needing additional arrangements are assessed individually before a delivery commitment is made.

06

Ready for the workday

Check the agreed furniture and extras, door operation, lighting, ventilation and controls with your installer. Retain the final specification and assembly information. Report missing items or anything that does not work as expected before completing the handover.

Fire safety & building requirements

Sprinkler and fire-alarm options are available. We help you confirm the details for your pod and workplace.

Can you include sprinklers and fire alarms?

Yes. Choose the optional sprinkler and fire-alarm combo in the configurator. It is priced per pod and included in your configuration total when selected. Your building manager may request it as part of approving the pod for your space; the equipment, building-system connections and installation scope are confirmed for your site.

Discuss your building requirements

What should I know about fire ratings?

Fire information is specific to the model and materials. A material fire classification does not establish a fire-resistance rating for the complete pod. Ask us to confirm the relevant test documentation for your chosen model and finishes.

An acoustic “Class A” rating describes sound reduction, not fire performance.

Ask about fire-rating documents

What should we check before ordering?

Start with your building manager: they may have requirements for introducing a pod into your workplace. Share those requirements and your installation address with us so we can confirm the appropriate equipment and connections with your building team. Local fire requirements still apply; the package is not a blanket requirement for every pod.

A space of your own

Let's make it yours.

Choose the pod. Shape the details.
We bring your approved configuration together.

Design your pod Talk about your project Explore in 3D. No payment to begin.

Nationwide delivery and local installation

We deliver and install across England, Scotland, Wales and Northern Ireland, with local teams. Coverage includes London, Manchester, Birmingham, Leeds, Bristol, Edinburgh, Glasgow and Belfast, as well as other cities, regional and island destinations. Send the nation, postcode and access details so the quotation and installation schedule match the actual premises.

Your written quotation confirms the complete price, installation scope and schedule. The receiving route, building access and any special handling still need to be agreed for each address.

City and regional project guides